Wednesday, January 10, 2007

Upgrades - 1.0

I'd like to welcome another person to the fold of Niner SIR 9 owners.
Maggs.
Doing the right thing already, he decided that the Kona Unit 2-9 wasn't quite the steed it should be, and consequently upgraded to a SIR 9 in Godzilla Green. I swapped all the old components over tonight, including a very svelte Pace carbon fork.
And I forgot my camera today!
I'll get the shot tomorrow... I promise
tsk tsk tsk

Other upgrades include the addition of a reliable bench and hanging scale. I have no idea why I waited so long to get these, but I'm glad I finally did. I'll be correcting everything in the store as I can, and you can bet, that I'll be weighing EVERYTHING.
I know that Kermit weighs 24.5 with pedals right now...

There will be another couple of upgrade posts coming in the near future. Winter can be productive when it comes to getting the stable in order for the upcoming season.

1 Comments:

Anonymous Anonymous said...

1st ride details: Off the porch, Rt. 116 to Richmond road (pavement), to Texas Hill Rd. (Dirt), to the trail head (there's a right there too) at Hinesburg forest trails. Like George, no big ride here: 6 mile up hill leg burn up; teste freeze on the way back down. To give an idea what an abrupt VT temp change can be like: the same puddles I made wakes in on the way up were frozen on the way down--with in a 1/2 an hour. The bike: lively. erotic,...YES! The truth will blossom in the single track.

7:41 PM  

Post a Comment

<< Home